Plan seismic rehabilitation around route availability: assess ground and structural failure modes, dependencies, repairability and evidence needed to reopen.
Bridge rehabilitation begins with diagnosis. Examine repair options for decks, steel, bearings, and foundations, along with prefabrication and verification checks.
Rain, frost, thaw and drought can change subgrade support. Learn which ground conditions and field observations matter when assessing road foundations.